Mercedes-AMG GT SUV Debuts With 1,169 HP and 710 kW Charging

More

Global EV Sales Reach 2.15 Million in September as Europe Sets New Record

More

Tesla Roadster Revealed With Rocket Thrusters and 0–60 MPH in 0.81 Seconds

More

Peugeot E-T16 Concept is 816-HP Electric Hyperhatch Inspired by the 205 T16

More

Truemag

  • Electric Car News
  • Electric Car Reviews
  • Plug-in Hybrids
  • Technology
  • Home
  • About Us
  • Privacy Policy
  • Advertise
  • Charging Map




Magna to invest $790 million to build three new facilities in Tennessee. Magna to be the First Supplier at Ford’s BlueOval City Supplier Park.

Magna International Inc., one of the world’s largest automotive suppliers, is investing more than US$790 million in the U.S. to build three new supplier facilities, two of which will be housed at Ford’s BlueOval City campus in Tennessee.

In addition to the two West Tennessee locations, Magna will also build a stamping and assembly facility in Lawrenceburg, Tennessee. Combined, Magna will create approximately 1,300 new jobs in Tennessee.

Ford’s on-site supplier park will allow for vertical integration that helps ensure efficient production at BlueOval City, which will be capable of producing 500,000 electric trucks a year at full production. Magna will supply Ford’s BlueOval City with battery enclosures, truck frames and seats for the automaker’s second-generation electric truck.

Magna’s two facilities at BlueOval City supplier park include a new 800,000-square-foot frame and battery enclosures facility and a 140,000-square-foot seating facility.

The battery enclosures facility will join one of Magna’s sister plants in Ontario, Canada, which is currently producing battery enclosures for the Ford F-150 Lightning. The seating facility will produce polyurethane foam, and assemble and sequence “just-in-time” (JIT) complete seats.

Magna will employ approximately 750 employees at its battery enclosures facility and 300 employees at its new seating plant.

In addition, Magna will construct a new 400,000-square-foot stamping and assembly plant at the Team Lawrence Commerce Park – West, a Select Tennessee Certified Site in Lawrenceburg, Tennessee, that will produce truck frames. Magna will employ roughly 250 employees at this location.

Production at all three plants is scheduled to begin in 2025.

Tennessee has made significant strides in electric vehicle manufacturing with investments from companies like Magna. During Governor Lee’s administration, more than $14.8 billion has been invested in Tennessee and nearly 11,000 new jobs have been committed through EV-related projects.

Jul 21, 2023Blagojce Krivevski
New Mercedes-AMG GLC Debuts With 680 HP Plug-in Hybrid PowertrainMINI reveals retro-inspired interior for new Cooper Electric
You Might Also Like
 
Ford to Deliver More Power to Employees; Network of Charging Stations to Expand
 
Ford Makes Electric Vehicle Deal with Toshiba
Blagojce Krivevski

Blagojce Krivevski is physicist and green technology lover. Keep in touch with Blagojce through his email, web site, Twitter, Linkedin, Facebook and Google+.

July 21, 2023 Electric Car NewsBlueOval, blueoval city, ford, Ford BlueOval, Ford BlueOval City, magna, Magna International, Tennessee
Follow Us
  • facebook
  • twitter
  • google-news
  • linkedin
  • youtube
  • instagram
  • pinterest
  • rss
Recent News
2027 Lexus NX Gets 324 HP Plug-In Hybrid, 45-Mile Electric Range and DC Fast Charging
October 20, 2026
Waymo to Launch Driverless Robotaxi Service in Toronto in 2028
October 20, 2026
Volkswagen ID. Cross 37 kWh Goes on Pre-Sale From €27,995
October 20, 2026
Leapmotor B05 to Be Built in Spain as Zaragoza Plant Expands EV Production
October 20, 2026
VinFast Launches All-Electric Taxi Service in Los Angeles
October 20, 2026




About
ElectricCarsReport.com ElectricCarsReport.com is a website dedicated to pure electric vehicles and the full range of consumer information and tools about electric cars, green technology energy, and the environment.
Latest News
2027 Lexus NX Gets 324 HP Plug-In Hybrid, 45-Mile Electric Range and DC Fast Charging
October 20, 2026
Waymo to Launch Driverless Robotaxi Service in Toronto in 2028
October 20, 2026
Volkswagen ID. Cross 37 kWh Goes on Pre-Sale From €27,995
October 20, 2026
Get in touch

Email: contact@electriccarsreport.com

Get new stories by email:
Archives
  • facebook
  • twitter
  • google-news
  • linkedin
  • youtube
  • instagram
  • pinterest
  • rss
DMCA.com
© ElectricCarsReport.com | All Rights Reserved.