Aston Martin Valhalla Spider PHEV Debuts as Brand’s Fastest Open-Cockpit Supercar

More

2027 Lexus RZ Revealed: 402 HP, Up to 301 Miles of Range

More

Mercedes-AMG GT SUV Debuts With 1,169 HP and 710 kW Charging

More

Global EV Sales Reach 2.15 Million in September as Europe Sets New Record

More

Truemag

  • Electric Car News
  • Electric Car Reviews
  • Plug-in Hybrids
  • Technology
  • Home
  • About Us
  • Privacy Policy
  • Advertise
  • Charging Map




GKN Driveline expands eDrive production facility to meet increasing demand

GKN Driveline has announced a major expansion of its European eDrive production facility in Bruneck, Italy, as the global driveline leader moves to serve increasing demand for electric and hybrid vehicle programmes from new and existing OEM clients.

GKN Driveline will boost the current 11,000sqm floor space by more than 60%, to create an 18,000sqm facility dedicated predominantly to eDrive production. To facilitate the expansion, GKN will relocate other driveline production to alternative sites in Europe. The expansion will also help facilitate increase production of all-wheel drive technologies, such as electronic torque management units.

Between 70 and 80 employees who currently work on constant velocity joint (CVJ) production will move into eDrive manufacturing. The project will be complete by 2019, which will result in Bruneck being predominantly focused on eDrive production, with 10 eDrive programmes expected to be delivered from the site.

The Bruneck site’s manufacturing portfolio includes the PACE Award-winning coaxial eAxle, featured on a range of Volvo plug-in hybrids, the world’s first two-speed eAxle, equipped on the BMW i8 sports car, and all-wheel drive products such as GKN’s Electronic Torque Management systems. The site was established as a production facility in the 1960s and now employs approximately 800 people.

Beyond the Bruneck site, GKN also manufactures eDrive technologies in Japan, and it will commence production of eDrive systems in China next year with its Joint Venture partner, SDS.

GKN will relocate CVJ manufacturing from Bruneck to alternative Driveline facilities within Europe, while its Off Highway business will move to a new facility in Welsberg-Taisten, Italy.

Peter Moelgg, GKN Driveline All-wheel and eDrive CEO, said: “Bruneck has already established itself as a centre of excellence for the production of leading electric driveline systems. This major expansion will enable eDrive production to move up a gear, to deliver the growing number of programmes won by GKN for next-generation hybrid and electric vehicles.”

Jun 2, 2017Blagojce Krivevski
EVs outsell Plug-in Hybrids in Europe for the first time in six quartersDaimler and BAIC to Make Electric Cars in China
You Might Also Like
 
Bosch launches new electric drive for light commercial vehicles
 
GKN to unveil next-gen EV driveline at Frankfurt Motor Show
Blagojce Krivevski

Blagojce Krivevski is physicist and green technology lover. Keep in touch with Blagojce through his email, web site, Twitter, Linkedin, Facebook and Google+.

June 2, 2017 Electric Car Newsedrive, GKN, GKN Driveline, gkn edrive
Follow Us
  • facebook
  • twitter
  • google-news
  • linkedin
  • youtube
  • instagram
  • pinterest
  • rss
Recent News
Mercedes-Benz Abandons Its European Charging Network as Electra Takes Over 47 Fast-Charging Hubs
November 3, 2026
BMW to Bring Advanced Level 2 Autonomous Driving Assistance to City Streets in 2027
November 3, 2026
Smart #2 Couture Edition Sells Out Before First Deliveries Begin
November 3, 2026
Milence Opens Fifth Belgian Charging Hub With Megawatt Charging for Electric Trucks
November 3, 2026
OMODA and JAECOO Buyers Can Get a Free EV Charger or £1,000 in Charging Credit
November 2, 2026




About
ElectricCarsReport.com ElectricCarsReport.com is a website dedicated to pure electric vehicles and the full range of consumer information and tools about electric cars, green technology energy, and the environment.
Latest News
Mercedes-Benz Abandons Its European Charging Network as Electra Takes Over 47 Fast-Charging Hubs
November 3, 2026
BMW to Bring Advanced Level 2 Autonomous Driving Assistance to City Streets in 2027
November 3, 2026
Smart #2 Couture Edition Sells Out Before First Deliveries Begin
November 3, 2026
Get in touch

Email: contact@electriccarsreport.com

Get new stories by email:
Archives
  • facebook
  • twitter
  • google-news
  • linkedin
  • youtube
  • instagram
  • pinterest
  • rss
DMCA.com
© ElectricCarsReport.com | All Rights Reserved.