Ford has announced the first U.S. markets slated to receive the all-new Ford Focus Electric, which debuts in late 2011.
The first markets selected for Ford Focus Electric: Atlanta, Austin and Houston, Texas; Boston, Chicago, Denver, Detroit, Los Angeles, San Francisco, San Diego, New York, Orlando, Fla., Phoenix and Tucson, Ariz.; Portland, Ore.; Raleigh Durham, N.C.; Richmond, Va., Seattle, and Washington, D.C.
Markets were chosen based on several criteria, including commuting patterns, existing hybrid purchase trends, utility company collaboration and local government commitment to electrification.
As part of the collaboration with dealers, utilities and local governments, Ford will help develop consumer outreach and education programs on electric vehicles as well as share information on charging needs and requirements to ensure the electrical grid can support customers’ needs.
Focus Electric, available in late 2011, will be built at the Michigan Assembly Plant in Wayne, Mich. Production will occur on the same line as the gasoline version of the Focus. Using an existing vehicle platform and assembly line will give Ford the ability to vary production based on demand for the Focus Electric.
Ford has an aggressive strategy that will deliver a range of electrified vehicles in both Europe and North America, including the Transit Connect Electric small commercial van, two next-generation lithium-ion battery hybrids and a plug-in hybrid.[wzslider height=”400″ lightbox=”true”]





